Keep the electrodes in reliable contact with the liquid
For horizontal installation, keep electrodes away from locations where gas or deposits can collect. Check the allowed orientation in the manual for the model.
An electrode at the crown can come into contact with trapped gas. An electrode at the bottom can be covered by sediment. Position the instrument within the orientations permitted by the manufacturer.
Check local conditions at the sensing point
The conductive liquid, electrode interfaces and reference connection form the path of the weak measuring signal. First check continuous electrical contact with the liquid. Then inspect electrode fouling or a changed reference. Readings during one process stage show that a signal exists at that stage. They do not guarantee the same signal margin throughout the cycle.
Check the electrode axis against the installation drawing. Conditions at the sensing point may differ from conditions in the bulk liquid. Conductive, dielectric and optical sensors respond to different material properties. Bridging, retained films and insulating deposits can change responses in opposite directions. A liquid trial should cover both wetting and residual liquid after drainage. A demonstration with clean water or a simulated signal cannot represent all actual operating conditions.
Field checks
- Verify the electrode axis on the installation drawing. Record flow readings and any available electrode or empty-pipe diagnostics. Separate the measurements captured from functions the instrument does not support.
- Record the minimum, typical and most unfavorable operating conditions that affect the electrode position. State their duration and the source of the observations.
- Document the electrode axis and the installation drawing before and after checking orientation. Preserve the original setup and process conditions and change one factor at a time based on the evidence.
Example: gas collecting at the top of a horizontal pipe
Suppose bubbles at the pipe crown contact a top-mounted electrode. Check the orientations permitted for the model and retest under the actual filling conditions before concluding that a side orientation improves the readings.
Compare the observed conditions with the original basis for selection.
Record the orientation and the result
Support your conclusion with the electrode axis on the sensor installation drawing. Record the conditions tested, the comparison basis and any open items. Retain the original orientation and configuration. An output simulation cannot verify parts of the measuring chain it bypasses.
This is an illustrative case. Follow the limits of the installed model and the site procedures. Use Doweston’s supply documents to confirm equipment specifications and certification.