نظام الاختيار الإلكتروني
مرحباً بك في مكتبتنا الشاملة للأجهزة والمجسّات. اعثر بسرعة على المنتج والحل المناسبين لتطبيقك. ابدأ بالبحث أو اختر منتجاً.

Technical articles are currently available in Chinese and English. English content is shown below.

← Back to knowledge hub
Field troubleshooting3 min readUpdated 2026-10-14

Why is flow displayed when the process appears stopped?

Check the actual no-flow condition, filling, stability, display variable and status before treating zero calibration as the solution.

Start an application checklist

Identify what the display represents

Record model, alarms, units, displayed variable and the reading over time. Instantaneous flow, a totaliser and a control-system calculation are different values. A totaliser retaining its historical value does not mean flow continues. Record positive or negative readings and timing rather than sending only one screenshot.

A closed valve is not proof of zero flow

Use existing operating records and process information to review bypasses, recirculation and possible valve leakage. Do not operate valves independently for this check. For liquid service, site personnel must also establish whether the tube is full, gas or phase changes are present, and temperature and pressure are stable.

Look for process and configuration clues

Observe whether the symptom coincides with pump operation, nearby vibration or process changes. Review direction, units, damping and low-flow cutoff through existing screens or configuration records. A cutoff may affect small displayed values; it does not establish that the underlying cause has been removed.

  • Record flow, density, temperature and alarms during the apparent no-flow period.
  • Keep existing configuration and recent change records for comparison.

When to involve an engineer

Refer persistent offset, alarms or uncertain no-flow/filling conditions to an engineer, who can determine whether zero verification or calibration is appropriate under the model's manual. This page is for observation and document checks, not field zeroing instructions. Opening covers, wiring, pipe removal, pressurised work and hazardous-area tasks require site procedures.

References and further reading

Coriolis application checklist

Gather fluid, flow, pressure/temperature and installation conditions to identify missing information and engineering checks.

Start an application checklist
لم تسجّل الدخول إلى DOWESTON؟
أنشئ حساباً لبدء الاختيار والاطلاع على الأسعار وتلقّي نشرتنا الإلكترونية بأحدث المنتجات والاتجاهات.
المنتجات والخدمات
تقدم Doweston مجموعة خدمات لمساعدتك في بناء أنظمة القياس الآلية بسرعة. تواصل معنا لمعرفة المزيد.
هل أنت مستعد للشراء؟
إ كنت ترغب في شراء المنتجات،
فما عليك سوى التواصل مع فريق المبيعات — يسعدنا مساعدتك.
من نحن
تقدم DOWESTON حلول قياس دقيقة وموثوقة
— منتجات استشعار وكشف موثوقة في جميع المجالات!
هل لديك طلب خدمة؟
إذا كنت ترغب في تحسين الإنتاج وتقليل فترات التوقف،
يمكننا مساعدتك في اختيار قطع الغيار وخدمات ما بعد البيع المناسبة.
تعديل بيانات التكوين

المنتج

العلامة التجارية

الطراز

تأكيد التعديل إلغاء
قد تكون شاشتك صغيرة جداً لتجربة مريحة.
ننصح بمتابعة استخدام حاسوب،
أو تواصل فوراً مع مهندس لاختيار المنتج المناسب!
خدمة أسرع؟ اتصل على
400-888-4436
متابعة التصفح