نظام الاختيار الإلكتروني
مرحباً بك في مكتبتنا الشاملة للأجهزة والمجسّات. اعثر بسرعة على المنتج والحل المناسبين لتطبيقك. ابدأ بالبحث أو اختر منتجاً.

Technical articles are currently available in Chinese and English. English content is shown below.

← Back to knowledge hub
Selection and applications4 min readUpdated 2026-10-14

What should be checked before installing a Coriolis meter?

Build an engineering checklist covering filling, orientation, temperature, pressure, supports, access and hazardous-area approval scope.

Start an application checklist

Start with the exact model's manual

Tube shape, sensor design and transmitter configuration can change orientation and support requirements. A principle that does not require a particular velocity profile does not remove all straight-run, vibration or installation checks. Use drawings, installation instructions and safety documents matching the model, configuration and revision.

Check whether the fluid state can be maintained

For liquid service, assess full-tube conditions, gas accumulation and draining. For gas service, consider condensate and related effects. Choose orientation from the specific manual and process design, not a universal direction rule. Identify drainage, hygiene, cleaning and heat-tracing needs during design.

Review mechanical, environmental and electrical limits

  • Temperature, pressure, connection ratings, materials and ambient limits must cover operating and cleaning conditions.
  • Use drawings to review space, supports, piping stress and visible vibration sources.
  • Check power, cables, grounding, communications and maintenance access.
  • For hazardous areas, review the certificate's models, temperature limits, area scope and special conditions.

Confirm suitability, not just physical fit

Keep a location drawing, fluid data, support proposal, certificates and unresolved questions for engineering review. Installation, wiring, valve operation, pipe removal, cover opening and commissioning require authorised personnel following site procedures and product instructions. This is a design checklist, not an installation or hazardous-area work procedure.

References and further reading

Coriolis application checklist

Gather fluid, flow, pressure/temperature and installation conditions to identify missing information and engineering checks.

Start an application checklist
لم تسجّل الدخول إلى DOWESTON؟
أنشئ حساباً لبدء الاختيار والاطلاع على الأسعار وتلقّي نشرتنا الإلكترونية بأحدث المنتجات والاتجاهات.
المنتجات والخدمات
تقدم Doweston مجموعة خدمات لمساعدتك في بناء أنظمة القياس الآلية بسرعة. تواصل معنا لمعرفة المزيد.
هل أنت مستعد للشراء؟
إ كنت ترغب في شراء المنتجات،
فما عليك سوى التواصل مع فريق المبيعات — يسعدنا مساعدتك.
من نحن
تقدم DOWESTON حلول قياس دقيقة وموثوقة
— منتجات استشعار وكشف موثوقة في جميع المجالات!
هل لديك طلب خدمة؟
إذا كنت ترغب في تحسين الإنتاج وتقليل فترات التوقف،
يمكننا مساعدتك في اختيار قطع الغيار وخدمات ما بعد البيع المناسبة.
تعديل بيانات التكوين

المنتج

العلامة التجارية

الطراز

تأكيد التعديل إلغاء
قد تكون شاشتك صغيرة جداً لتجربة مريحة.
ننصح بمتابعة استخدام حاسوب،
أو تواصل فوراً مع مهندس لاختيار المنتج المناسب!
خدمة أسرع؟ اتصل على
400-888-4436
متابعة التصفح